Chinese translation for "cargo handling capacity"
|
- 货物吞吐量
货物装卸能力 货物装卸作业能量
Related Translations:
cargo: n.(pl. cargos, cargoes) 船货;负荷,荷重。 ship [discharge] the cargo装[卸]货。 a cargo boat[ship, vessel] 货船。 handling: n.1.处理,管理;操纵。2.装卸。短语和例子handling equipment 辅助设备。 handling guy 搬运索。 handling radius 工作半径。 handle: n.1.柄,把手;曲柄;摇柄。2.(摸皮革、织物等的)手感。3.把柄,可乘之机,口实。4.〔口语〕头衔,称号。5.(赛马等时投下的)赌金总额。短语和例子a crank handle 手摇曲柄。 a hammer handle 榔头柄。 a handle to one's name 〔口语〕头衔〔如 Lord, Dr. 等〕。 an operating handle 控制柄,
- Example Sentences:
| 1. | The mainland government was also upgrading the cargo handling capacity and efficiency of the rail network 内地政府亦正提高货物装卸量及铁路网络的效率。 | | 2. | This paper first analyzes the basic situation of zhangjiagang port , and make a combination forecast of the port ' s cargo handling capacity 鉴此,本文拟对张家港港口的未来发展规划作一研究。 | | 3. | Article will make analysis for port market development condition , with the method qualitative analysis and quantitative analysis , for opening zhangjiagang port ' s bulk cargo handling capacity make forecast 文章将对港口市场的发展状况作出分析,采用定性分析与定量分析相结合的方法,对张家港港散货吞吐量作出预测。 | | 4. | Bottleneck does not exist in qinhuangdao port , thanks to 1 ) an extra 50m tonnes ( 35 % ) annual cargo handling capacity facilities at phases 4 & 5 of the port , and 2 ) 50m tonnes ( 25 % ) new capacity at daqin railway line which links shanxi and qinhuangdao port 在秦皇岛港没有出现运输瓶颈,这得益于1 )港口新增了50万吨( 35 % )的年吞吐量, 2 )在山西和秦皇岛之间的大秦铁路线新增了50万吨运力( 25 % ) 。 | | 5. | The research of this paper includes three parts : the first , according to the statistical figures about the cargo transport in recent years , it analyzes cargo transport structure and the changing law and the internal reason of cargo transport . at the same time it analyzes and calculates the change of the arriving ships " structure for a systematic and full understand of the transport demands . the second , it make a scientific forecast of the port ' s future cargo capacity making use of the grey forecast system , which provides scientific basis for medium - long term development plan of the port ' s cargo handling capacity 本文研究的工作主要分三个部分:第一,根据张家港近年来有关货物运输的一些统计数据,对货物运输的结构和规模演变的规律及内在原因作一剖析,同时对到港船舶的结构变化进行预测,以求对运输需求有一个系统全面的了解;第二,应用灰色预测系统对张家港港未来港口货运吞吐量进行科学预测,为张家港港货物装卸能力规划提供科学依据;应用物元分析技术对张家港港口的未来发展前景作出一定程度的分析、研究,找出张家港港口未来发展规划的零散无序、不成系统的因素,总结前人经验的基础上采用综合评判物元模型进行评判,在预测港口未来发展规划是否科学实际上具有独到见解。 | | 6. | The forecast and research of this paper about the port ' s cargo handling capacity , is based on the port ' s production characteristic , it puts grey forecast theory into the port ' s future cargo handling capacity and checks the forecast result . grey forecast theory is more scientific , reasonable and practical in using of historical counting material compare with traditional forecast theory . . it avoids man - made influence in practical works 本文对港口吞吐量的预测研究,是根据港口生产的特点,应用了灰色理论来对吞吐量进行预测,并对预测结果进行检验,与传统的预测方法相比,在应用历史统计资料上更具有科学性、合理性和实用性,避免了实际工作中的人为因素影响,对张家港港口发展提供有益的参考,具有一定的现实意义。 |
- Similar Words:
- "cargo handling by conveyer system" Chinese translation, "cargo handling by conveyor" Chinese translation, "cargo handling by conveyor system" Chinese translation, "cargo handling by deck crane" Chinese translation, "cargo handling by derrick" Chinese translation, "cargo handling capacity of a port" Chinese translation, "cargo handling charge" Chinese translation, "cargo handling charges" Chinese translation, "cargo handling computer" Chinese translation, "cargo handling contract" Chinese translation
|
|
|